- This event has passed.
Podcast Episode Eight – The Bath Bridge Rehabilitation with Sean James
December 6, 2022
Kim interviews engineer Sean James, Senior Vice President at Hoyle, Tanner & Associates in Manchester, about the 2014, twenty-one-month-long rehabilitation of the Bath Bridge in Bath, New Hampshire. Sean walks us through the process of carrying out a $2 million project on a 375’ covered bridge and shares some interesting stories he learned along the way.