Loading Events

« All Events

  • This event has passed.

Podcast Episode Eight – The Bath Bridge Rehabilitation with Sean James

December 6, 2022

Kim interviews engineer Sean James, Senior Vice President at Hoyle, Tanner & Associates in Manchester, about the 2014, twenty-one-month-long rehabilitation of the Bath Bridge in Bath, New Hampshire. Sean walks us through the process of carrying out a $2 million project on a 375’ covered bridge and shares some interesting stories he learned along the way.

Details

Date:
December 6, 2022
Event Category:
Website:
https://podcast.coveredbridgesnh.com/

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to top